Skip to content Skip to navigation

DO-178 Projects Level A, B, C Validation and Validation Services

Proven teams provide Verification and Validation support at every stage from project start up to completion of the project to meet the DO-178 Based certification requirements in the testing of critical software. The stages and activities supported in this context are summarized below:
  • Planning
    • Preparation of Software Verification Plan and review of compliance with other plans
    • SOI-1 Support
  • Requirements and Design Review
    • Review of High Level Requirements
    • Review of Software Architecture and Low-Level Requirements
    • SOI-2 Support
  • Tests and Analysis
    • Requirement Based Tests
      • Hardware/Software Integration Tests
        • Finding errors related to software running on target hardware
        • Testing that the functionality defined in the higher-level requirements to be identified
      • Software Integration Tests
        • Focus on relations between requirements and meeting design requirements
        • Testing the software units correctly communicating with each other and meeting the requirements and design
      • Lower Level Tests
        • Testing that the software meets the low-level requirements
    • Performance Tests
    • Worst Scenario Time Analysis 
    • Traceability Analysis
    • Requirement Coverage Analysis
    • Structural Coverage Analysis
    • SOI-3 Support
  • Car Qualification
    • Qualification and preparation of qualification package for verification tools which require qualification as required by DO-178 rules
      • Car Qualification Plan
      • Car Operational Requirements and Testing
      • Car Performance Summary
  • Software Completion and Certification
    • Supporting the preparation of Software
    • SOI-4 Support